1st get rid of anything that will make laying the floor difficult. Went around and punched down all the floor board nails.
I confused the tiles sizes... I thought 0.5m? no... 0.5m x 0.5m each so I only bought half what I needed.... but they have started to go down. If Christine ever gets fed up with work could have a job as a carpet fitter, much better at it than I am.
The office side complete looks much better than I thought it might.
Whilst that was going on inside I finshed off few tasks outside.
PIR Door light (will wire up later)
Complete electrics secondary earthing (the trench is to be filled to about 3" below the pipe join.