No work just photos
No work this morning, but took a couple photos whilst kettle boiled.
The shed roof is on, windows in and door (with lock installed). Still got to tidy the edges but far too wet at the moment.
The window condensation appears to be on the outside as inside the shed is dry.
The part upright black conduit on right of door will have a PIR light fitted once the felt and guttering are done.
The house end (50m away) of the data cable feeds. I used Blue PVC water pipe as it was cheap and thick walled. Two new black CAT 6 cable pulled down to Hut 304, so with the original grey one that means 3 network cables pulled. The other is an intercom (or telephone extension).
The route the cables will follow in 25mm conduit.
The two on the right are the internet and telephone, they may also be fed into conduit that will hold all the other cables. As got to work just temporary fix right now. Will be much neater, horizontal until vertically below the entrance hole. I just wired up two without the conduit for now (it is very wet) one grey CAT5 to the workshop (temp office) other to Hut 304.
The shed roof is on, windows in and door (with lock installed). Still got to tidy the edges but far too wet at the moment.
The window condensation appears to be on the outside as inside the shed is dry.
The part upright black conduit on right of door will have a PIR light fitted once the felt and guttering are done.
The house end (50m away) of the data cable feeds. I used Blue PVC water pipe as it was cheap and thick walled. Two new black CAT 6 cable pulled down to Hut 304, so with the original grey one that means 3 network cables pulled. The other is an intercom (or telephone extension).
The route the cables will follow in 25mm conduit.
The two on the right are the internet and telephone, they may also be fed into conduit that will hold all the other cables. As got to work just temporary fix right now. Will be much neater, horizontal until vertically below the entrance hole. I just wired up two without the conduit for now (it is very wet) one grey CAT5 to the workshop (temp office) other to Hut 304.
Sunday, 20 October 2013
Door rehung and electrics boxed up
Door out.
Door back in time to sit down...
Door refitted.
Critical inspection.
Electrics all boxed up.
Door back in time to sit down...
Door refitted.
Critical inspection.
Electrics all boxed up.
Roof.... and then it rains again!
Managed to get all the insulation boards up.
Creosoted them.
Felted a couple of rolls, as the sun went down, about to add another and the rains come down.
Creosoted them.
Felted a couple of rolls, as the sun went down, about to add another and the rains come down.
Tuesday, 15 October 2013
Getting there....
Donated a nice chair
Shack side electrics and switch to outside
Lots of light through windows, just fitted handles
Birthday present of a hoover last month that fits to the wall
Shack side electrics and switch to outside
Lots of light through windows, just fitted handles