Other than a trip which might get the odd mention I will detail projects I am working on, what I want to be working on and what I have otherwise to report on.
I will update the individual projects as they advance.
As asked I have started to catalogue the references I have follow the link on the left where you can obtain them too. Want to email me wander over to qrz.com and you'll find my email address there. Also twitter @m1kta_qrp
Wednesday, 6 February 2019
FA-VA5 Antenna Analyser from SDR-Kits
The parcel arrived last week just got around to looking at it.
Will put this together tomorrow and start on antennas at w/e.
I bought the carry case and the calibration kit as well.
First job post finish (not much to actually build) is to confirm/determine the lengths/resonant frequency of the GP for 10/15/20/40 and 80m will use in C6AKT and the 1/4 wave feed lines for the 40m 4SQ.
Have new cable for the 40m feeders as well as the previous. The 40m 4SQ phase controller will check over the LC and f values as well as the phasing.
First job post finish (not much to actually build) is to confirm/determine the lengths/resonant frequency of the GP for 10/15/20/40 and 80m will use in C6AKT and the 1/4 wave feed lines for the 40m 4SQ.
ReplyDeleteHave new cable for the 40m feeders as well as the previous.
The 40m 4SQ phase controller will check over the LC and f values as well as the phasing.
This comment has been removed by the author.
ReplyDelete