Thursday, 24 October 2013

Floor is in (half of it anyway ran out of floor tiles)

1st get rid of anything that will make laying the floor difficult. Went around and punched down all the floor board nails.


I confused the tiles sizes... I thought 0.5m? no... 0.5m x 0.5m each so I only bought half what I needed.... but they have started to go down. If Christine ever gets fed up with work could have a job as a carpet fitter, much better at it than I am.


The office side complete looks much better than I thought it might.


Whilst that was going on inside I finshed off few tasks outside.

PIR Door light (will wire up later)




Complete electrics secondary earthing (the trench is to be filled to about 3" below the pipe join.






No comments:

Post a Comment