Wednesday, 18 September 2013

Concrete now curing

I will be adding some decking board surrounds and the top will have a layer of 10mm gravel added before the shed base it put onto it. I was amazed by how much the base needed to rise on the right, it is almost 200mm (8") thick to be level with the left.

I was not looking for a mirror finish as I will add gravel, that will act as a water drain.





No comments:

Post a Comment