Just before xmas the parts and the specially wound transformer arrived along with a PCB that needed to be drilled so just finished drilling the PCB.
Dad suggested I need to make a metal brake/bender so that I can work with sheet aluminium (and steel) so ill make up a case for the valve tester.
Johnny (SM7UCZ) also suggested a double triode tester as well.
Sunday, 1 January 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment